Model essay on conversion request (I)
Ruzhou Electric Power Co., Ltd.:
The power station area of Ruzhou Finance and Accounting School is equipped with the establishment of the school in the 1980s, with a power of 30KV, which can meet the work demand at that time. However, with the development of society, the increase of school teaching facilities and living facilities, the increase of power load, power outages or power outages occur from time to time. At the same time, due to the aging of transformers, a considerable amount of funds are spent on repair or maintenance every year, which wastes manpower, material resources and financial resources and affects the normal development of school work. In order to meet the electricity demand of normal teaching facilities and living facilities, it is urgent to replace transformers and expand power capacity. But due to the shortage of funds, there is no money to buy transformers again. After reaching an agreement with the Municipal Agricultural Machinery School, the Municipal Finance School and the Agricultural Machinery School use the same transformer (that is, the transformer of the Agricultural Machinery School is used, and its power is 100KV), and the power supply account of the Finance School is listed separately, and the power supply price is charged according to the original power supply price of the Finance School. In order to replace the power equipment as soon as possible, expand the power capacity, and maintain the normal work demand of the school, the leaders of the municipal electric power company are specially invited to check and implement it on site.
No, please indicate.
Conversion request model 2
Yu 'an District Government:
The Qingshan section of G 105 National Highway is widened and reconstructed, with a total length of 9.6 kilometers, passing through four villages in my hometown. Now the project is in progress, but the problems left over from the later period have been dealt with accordingly. According to document (20xx)67 and related documents, the specific calculation is as follows:
1. Expansion of Hongqiao Village Settlement: 4.2 195 mu of agricultural land? 33350= 140720.3 yuan (see attached table for details);
2. 105 national highway widening plot 1: agricultural land 3. 168 mu? 33350= 105652.8 yuan (see attached table for details);
3. 105 Land reclamation plot widened by national highway II: agricultural land 1.245 mu? 33350=4 1520.75 yuan (see attached table for details);
4. Anhui Qingshan Landscape Architecture Co., Ltd. compensated ornamental trees and attachments for 399,969.55 yuan (see annex for details);
5. 105 make-up of outdoor attachments of national highway widening and reconstruction project 107720 yuan (see attached table).
6. Land requisition for supporting projects of Tumen resettlement site: 6.369 mu of agricultural land? 33350=2 12406 yuan, and the construction land is 0. 1245 mu? 16675=20XX yuan. Subtotal: 2 14482 yuan. (See attached table for details)
7. Tumen Store Settlement Phase II: 2.493 mu of agricultural land? 33,350 yuan =83 14 1.5 yuan. (See attached table for details)
The total amount is RMB one million and ninety-three thousand two hundred and sixty-nine Yuan only (1093206.9 Yuan).
I therefore urge the district government to allocate funds as soon as possible. Are the above requirements correct? Please indicate!
The third part of the model essay on transformation guidance
Provincial Water Resources Department:
In order to strengthen water conservation, protect groundwater resources, reduce sewage discharge and establish an advanced model of water saving, our bureau intends to choose Jinhu Casting and Forging Co., Ltd. as a typical water saving enterprise to support it. Jinhu casting and forging co., ltd was established in 20XX. Is a member of Jinhu Petroleum Machinery Group, a joint-stock enterprise controlled by Jinhu Petroleum Machinery Co., Ltd., with independent legal personality and AAA credit rating. The company has fixed assets of more than 80 million yuan, covers an area of 108482 square meters, and employs more than 300 people. It is one of the largest casting and forging enterprises in northern Jiangsu. The annual production capacity of steel castings is 10000 tons, and that of forgings is 10000 tons. The products have passed the ISO900 1 quality system certification. Mainly for oil drilling, chemical industry, metallurgy, construction machinery to provide high and medium pressure valves, shaft gears and other carbon steel, low alloy steel castings and forgings. Among them, oil drilling and production machinery products adopt American API standards, covering major domestic oil fields and exporting overseas.
At present, the company takes about 6.5438+500,000 cubic meters of groundwater annually, which is mainly used for production and life. In production, enterprises are mainly used for cooling. Although a cooling water recovery device has been installed in a workshop, a large amount of cooling water is still discharged. The reuse rate of enterprise water is lower than the average level of the whole province, and the newly added water consumption per unit product is much higher than the "Jiangsu Province Industrial and Urban Domestic Water Quota". The company is located in the hilly area, belonging to the underground water drop funnel area. The groundwater level is decreasing year by year. The water use plan issued by our bureau is always insufficient, and the contradiction of water use is prominent. The level of water consumption is not in harmony with the production level of enterprises, and water has become a bottleneck affecting the development of enterprises.
At the beginning of this year, the company took the initiative to find our bureau to carry out water-saving technical transformation. Considering that this enterprise is a big profit and tax collector in our county, and in line with the purpose of serving enterprises and the masses, our bureau sent people to conduct a comprehensive investigation on the water consumption of enterprises, and put forward suggestions on the water-saving transformation of enterprises. It mainly includes the newly-built resin sand production line of air compressor in the first and second casting workshops, and all the cooling water in the two workshops is recycled to realize zero consumption of industrial water, with a total investment of about 6.5438+million yuan. With the coordination of county leaders, our bureau is required to subsidize 654.38 million yuan from the water resources fee for the company's water-saving technical transformation, which mainly includes: water balance test, 2 intelligent water meters, 3 secondary water meters, 4 tertiary water meters, 20 sets of water-saving appliances, 2 deep well flushing, deep well pump and pressure tank maintenance.
In order to support enterprises to carry out water-saving transformation and protect groundwater resources in groundwater over-exploitation area, our bureau intends to agree to the request of enterprises. Request provincial leaders to support some funds to complete water-saving technical transformation projects.
If the above explanation is negative, please indicate.
Guess you are interested in:
1. is a model essay on office renovation.
2. Model essay on urban sewer reconstruction
3. Model essay on toilet renovation
4. Transform the application reporting model.