What's the difference between graphic layout and graphic design?

What's the difference between a plan and a plan? A plan is a kind of map. When the survey area is small and the radius is less than 10 km (even 25 km), the horizontal plane can be used instead of the horizontal plane. On this premise, the ground scenery in the survey area can be projected onto the plane along the vertical line, and the similar figure formed by shrinking according to the specified symbol and scale is called the plan.

Floor plan Floor plan is a concise graphic form of factory floor plan, which is used to indicate the relative plane position of buildings, structures, facilities and devices. The common method of drawing plane layout is plane model layout. According to the range of layout objects, the floor plan can be divided into factory general layout, workshop layout, workshop layout, device layout and underground pipe network layout.

The difference between indoor CAD plan and plan and design. There are many materials for long-term design, and many things that you seem to be difficult to do have become very easy in the hands of designers. This is not difficult for difficult people, but it is not difficult for difficult people! As for the process, someone has already answered you!

The concrete difference between floor plan and floor plan: floor plan can be said to show the position of specific things or general floor plan in the building.

Floor plan: This is the floor plan of a building.

5S floor plan and factory floor plan the combination of people, things and sites at the production site. Code combination status, name and definition color identification specify a tight combination status: refers to the workpiece being processed or just finished. Fruit green line code: the marking width of fixed areas A, B, C and D is 90 mm. B. Loose combination state: the workpieces temporarily stored in the production site cannot be reworked or run immediately. The light red line C is relatively fixed: non-processed products, such as auxiliary materials and process equipment used in production; The orange line D is waste: all kinds of waste items, such as waste, scrap, scrap iron, garbage and items unrelated to production. The marking width of the black line e security inspection channel and the white line e security inspection channel is100 mm.

What's the difference between foundation construction layout and main body layout? Architectural layout is to express the relative position and layout of buildings and structures on the plane. The main differences between it and architectural construction drawings are: 1, the former is not deep enough, and it may be schematic diagram, sketch, scheme diagram, planning diagram and preliminary design diagram;

2. The design of the latter is thorough and meticulous, and it is the "script" of architecture and structure.

3, the latter is the main part of the design documents, is the guidance and basis of construction;

4. The latter is the basis of acceptance; 5. The latter is the information that must be entered into the archives.

CAD plan 1. Look at the draft of the survey plan first, usually by yourself.

2. Return to the workbench for analysis, arrange drawings, and finally start the software CAD work. If the installation has a natural effect, the efficiency will be accelerated.

3. Click Grid Bar-Draw Grid and enter the size of the wall.

4. Enter horizontal and vertical data. If the home area is small, this step can be omitted.

5. The axes drawn are so dense and there are so many lines.

6. Now turn the axis of the painting into a wall.

7. Click the axis state of the mouse to generate the wall.

8. Enter the wall thickness, such as 240, 180 and 120. Remember, the value entered here is half and half.

9. The shaft is now a wall with double solid lines.

10. Mark the size of the plan in detail. This place is more convenient and faster than just using CAD.

1 1, draw a column according to the actual situation. Column here, enter the length, width and size of the column.

12, click the location and press Post.

13, then draw the stairs, click the stair tool on the left, and find the double running stairs. Enter the number, width, height and landing of stairs.

14. After putting it in a suitable place, continue to add windows to the apartment. Enter the height value of the adjusted window here.

15, hide all the axes just now, remember not to delete them, because they may be used later. Operate on line 0.

16, sorting labels and beautifying drawings, the rest of the work is to put them in the layout of sofas, beds, kitchen utensils and sanitary ware.

Find CAD layout. This is the socket layout. The living room TV must have wired sockets and digital TV sockets, the sofa must have telephone line sockets, and the bathroom and kitchen must have splash-proof sockets. You can arrange others as needed.

How to draw the bridge plan, and what is the difference from the general plan? The plane layout of the bridge is considered as a part of the engineering layout.

The general plan includes the side piers, overlooking the bridge deck, nearby planning and surrounding traffic conditions, and includes the bridge structure, the external envelope of the project, the workers' work frame, expansion joints and the number of each pier and bridge.

As for the plane layout, you only need to look down from the side and look down from the top, which is mostly used for the direction and distribution of overpasses on expressways or the side view between valleys. There are few details, but you must show them, for example, cable-stayed columns, several bridge opening, sidewalks and railings around them.

What's the difference between equipment layout and thermal system diagram? The floor plan shows the installation location of the equipment.

The system diagram looks at the installation of a system, which is more vivid and intuitive.

The two combinations can better express the design intention.