Summary of Annual Personal Work of Substation Attendant

Summary: Write down the main work contents, achievements and shortcomings, and draw conclusions, so as to correct shortcomings and learn lessons, so as to do a better job in the future. The following is a summary of the annual personal work of the substation attendant for everyone, hoping to help everyone.

article 1:

since the post competition in October of 2XX, the organization has made me the director of XX Electric Power Dispatching Institute. In the past year, I have lived up to the high expectations of the bureau leaders. According to the promise I made when I took office, I have done every job diligently and painstakingly. In the past year, with the strong support and help of the leadership of the bureau, colleagues and all the staff, I led the staff of the institute to successfully complete all the tasks, and made some contributions to the safe, stable and continuous operation of xx power grid, which was well received by my colleagues. Below, I will report to you the completion of my own work in the past year, please give your comments.

first, constantly strengthen the study of political theory and improve ideological and moral quality.

second, actively implement the strategy of southern power grid, and promote the overall progress of power dispatching according to the idea of systematization, standardization and index of production management.

the management idea of systematization, standardization and indexation of production management is the clear direction of safety production management of China Southern Power Grid Corporation, with the aim of making the safety production of China Southern Power Grid realize the management goal of controllability and control. How to steadily promote the construction of safety production risk management system in grass-roots units, so that all staff can establish the idea of risk management and systematically master the methods of risk pre-control is the overall direction of our work. Under the guidance of this safe production management idea, over the past year, I have actively led all the team members, and under the guidance of the leaders in charge of the bureau and the superior dispatching department, I have successfully completed all the work indicators and tasks assigned by the leaders. No accidents of power grid, equipment and personal safety occurred in the whole year, which ensured the safe, stable and continuous operation of the power grid. The main work we have carried out in the past year is reported as follows.

1. Operation mode and planned maintenance

(1). At the beginning of the year, our dispatching office compiled the annual operation mode of xx power grid in advance according to the development plan and maintenance plan of xx power grid, and under the guidance of the superior dispatching department, it also compiled the monthly, weekly and daily operation modes to carefully predict and arrange the supply and demand of the power grid;

(3) Insist on monthly scheduled maintenance, hold a power outage balance meeting, reasonably arrange the power outage time, avoid repeated power outages, shorten the average power outage time of users and improve the reliability of power supply.

(4), comprehensively check the operation and overload capacity of the 35kV main transformer in xx Power Supply Bureau; At the same time, cooperate with the marketing department to count and register the users of xx power grid with their own generators to ensure the safe power supply and consumption of the power grid.

2. Relay protection work

Relay protection work is the weakness of our dispatching office, but under the guidance of the superior dispatching department, we have carried out the following work in succession in the past year:

(1) setting and calculating the interval of newly added industrial parks at 35kVxx station;

(2) The setting calculation of the main transformer with 35kVxx replacement twice;

(3), under the guidance of unified deployment of China Central Power Dispatching Bureau, we have carried out and completed the check and rectification of protection setting values of 35kV and below in xx power grid, and cooperated with the power transmission and transformation management to do a good job in the fixed inspection of protection equipment of each substation to ensure that the setting values are correct.

3. Dispatching operation and switching operation

In dispatching operation, we insist on carrying out the system of two votes and three systems, and carry out in-depth struggle against the three major security enemies, especially the switching operation, strictly implement the command ticket system of dispatching operation, and put an end to the operation without tickets and the occurrence of human misoperation accidents. The dispatcher does not give instructions for the power outage and maintenance work that violates the two tickets, thus ensuring the personal safety in the power production work. As of October this year, xx Dispatching Office has filled in 662 dispatching operation instruction tickets, accepted 336 first-class work tickets and 4 second-class work tickets, and the qualified rate has reached 1%.

(1) During the shutdown of Unit #2 of xx Power Plant from : on May 2 to 23: on May 8 this year, and during the emergency repair of Unit 9 of xx Power Plant from 8: 3 to 23: on June 7 and 8, the provincial dispatching office implemented an emergency pre-notification of orderly power consumption. Our dispatching office cooperated with the marketing department in time, completed the arrangement of orderly power consumption according to the index requirements, and explained it to customers in time.

(2) In terms of wind and flood prevention, at the beginning of the year, under the guidance of the superior dispatching department, our dispatching office revised the black start operation manual of xx power grid, compiled the typical operation instruction ticket of black start, and made a simulation preview of black start operation according to the power grid operation situation, which made a lot of preparatory work for wind and flood prevention. Before the arrival of the typhoon, the power grid operation plan was written in time to ensure power supply during the typhoon, and the accident was predicted in advance, and this year's Luotan and Nasha were successfully fought.

5. Completion of communication automation

Under the guidance of the deployment of the superior dispatching department, this year, our dispatching office has completed the remote control point number check of each substation of xx power grid, automated graphic check, and plans to complete the main wiring diagram and double number check and rectification of each substation before the end of the year.

6. Completion of the task of ensuring power supply on important holidays

In recent years, the leading group of the bureau has paid special attention to the work of ensuring power supply on important holidays. Under the guidance of the leaders in charge, our dispatching office has successively compiled six power supply protection schemes, namely: xx Power Grid New Year's Day Spring Festival Protection Scheme, xxxx Forum Power Protection Operation Scheme, xx Power Grid Protection Operation Scheme during Tomb-Sweeping Day and xx Power Supply Protection Operation Scheme during May Day. Due to the leadership's attention and precautions in the process of power conservation, we have won one victory after another.

III. Existing problems and ideas for the next step

(1) Existing problems

Over the past year, although we have done a lot of work and made some achievements, there is still a considerable gap between this and the requirements of China Southern Power Grid, mainly as follows:

1. Our own quality needs to be further improved

2. The power of relay protection is weak, which is right.

3. The security situation is still grim, and the safety awareness of the personnel on duty has not really reached the designated position.

(2), the next step of thinking

1, strengthen the work of relay protection, and strive to complete the preparation of relay protection setting calculation book for 35kV and 1kV equipment in xx power grid before the end of the year;

2. Seriously study and analyze the security situation of xx power grid, and take active measures to ensure the safe and stable operation of the power grid;

3. Strengthen unified scheduling, meticulous scheduling, economic scheduling and flexible scheduling, earnestly do a good job in the operation and management of the power grid, ensure the power supply in the county to a limited extent, and fully complete the tasks of xx power grid production scheduling;

4. Obey the overall situation and unite and cooperate. A person's strength is negligible. If you want to make achievements in your work, you must rely on all comrades to form a joint force to create a new situation in your work. I am determined to closely unite with colleagues in the Institute and the Bureau in the new year and strive to open up a new situation in electric power work under the leadership of the new leadership team of the Bureau.

chapter 2:

with the coming of the new year, we have passed the year of 2xx. Looking back, there is a bit of hard work and a bit of harvest. In 2xx, with the concerted efforts of the whole class and Qi Xin's cooperation, all production tasks were completed on the basis of ensuring safe production. The main work of 2xx is summarized

1. Safety in production:

1. Annual attendance rate is 98.xxxx.

2. The team system has been modified and improved.

3. Strictly implement the defect elimination management system and run three inspections. Effectively ensure the healthy operation of the equipment, and contribute to the safe and multi-power supply of our factory.

4. 18 items of equipment defects were found throughout the year, of which 15 switch of high standby transformer refused to operate in July and the neutral point of #1 main transformer overheated to 1 degrees in October, and all of them were promptly notified for maintenance and treatment. Put an end to possible equipment accidents.

5. Cooperate with the maintenance to complete the major and minor repairs of the unit and the replacement of related equipment. In the whole year, 161 large-scale operations were carried out and 47 work tickets were issued.

6. Organize the whole class to take the safety examination organized by the factory department, with a reference rate of 1xxxx and excellent results.

7. Carry out the activities of youth production safety demonstration posts in earnest throughout the year and review them through the Youth League Committee of the General Factory.

8. Five noes and zero violations were achieved throughout the year, and there was no unsafe phenomenon.

9. Seriously carry out security team activities, organize the study of relevant documents and technical measures, and draw lessons from relevant security incidents. Seriously carry out the inspection of spring safety and autumn safety, put an end to habitual violations, and rectify the problems found in time, effectively ensuring the production in security team.

1. By the end of the year, the number of production days in security team has reached 5,936.

11, strengthen team management, improve the quality of duty, no violation of rules and regulations throughout the year.

2. Training:

1. Completed regular training on time and with good quality every month, and achieved good results.

2. Organize the whole class to take the transportation regulation examination organized by the factory department, with a reference rate of 1xxxx and excellent results.

3. Organize to learn the knowledge of changing and replacing equipment for #3 generator, and master relevant operation skills.

4. Organize to learn operation regulations regularly.

5. Huang Jian was awarded the title of expert in electrical operation technology for units of 1mw and below in the General Plant.

6. The team trained one qualified monitor (Chengyang), one special area (Huang Yugang) and two duty officers.

7. Two personnel participated in the electrical operation training of 2mw units organized by the General Factory.

8. The training plan at the beginning of the year was realized.

Third, spiritual civilization construction and * management:

1. Completed the propaganda task assigned by the General Factory, and * * * contributed 15 articles. In particular, 5.18 accident essays and safety warnings have been adopted by the General Factory.

2. Make class affairs public on a regular basis. Announce the income and expenditure, source and use of class fees.

3. Regularly carry out the activities of evaluating the monitor by the name owner.

4. Actively pay special attention to the construction of workers' small families and carry out trade union activities, so that the class presents the phenomenon of unity and mutual assistance and the team has a strong cohesion.

5. Take an active part in two labor competitions organized by trade unions.

6. The youth safety demonstration post of our class successfully passed the review of the Youth League Committee of the General Factory.

7. Actively strive for the model team of the General Factory.

Fourth, do a good job in team building

Team is the cell and foundation of the enterprise, and the quality of team building is directly related to the development and survival of the enterprise. Doing a good job in team management, improving the quality of the staff, enhancing the vitality of the team and giving full play to the role of each member are the foundation of team construction.

1. Carefully standardize and timely make all kinds of ledgers, and implement fixed management for all instruments and shift data.

2, do a good job in team software records.

3. On the basis of the standard team, strictly follow the requirements of the model team and standardize the work in the class.

V. Existing problems and measures taken:

1. Insufficient implementation of the team system.

2. The learning progress of the new team members is not ideal.

3. Measures:

1) Strengthen the vertical implementation of the team system, give full play to the role of the five members of the team and the backbone, perform their duties, do their best, and implement the responsibility system.

2) Strengthen training and adopt different training methods for different people. Team training should be multi-angle and multi-way as far as possible. Make learning full of life.