Wuhan Metro Line 5 opening time and latest station details

The opening of Wuhan Metro Line 5 is about to begin, and it will be tested on October 25. "Shouyi Red" ran out of the most beautiful scenery. The latest news is that at the end of December 2021, Wuhan Metro Line 5 , Line 16 and Line 6 Phase 2 will be opened for operation. The latest opening time of Wuhan Metro Line 5

On October 25, on Fengsheng Road, Hongshan District, Wuhan City, a brand new "Shouyihong" subway train passed the elevated section across the Qingling River. From the Medical University Station, head towards Baisha 6th Road.

According to on-site observation, a pair of "Shouyihong" trains pass in opposite directions every 12 minutes. Neighboring residents said that the train test runs would continue into the evening every day.

It is reported that Wuhan Metro Line 5 is the first subway line in Wuhan to operate in fully autonomous driving mode. It is one of the main transportation lines connecting Wuchang District to Qingshan District. It is 32.5 kilometers long and has stations. 25 seats, as well as a parking lot and a depot, and the introduction of 35 trains. The line is expected to be open to traffic by the end of the year.

It is reported that the train put into use on Line 5 is the first fully autonomous subway train "Made in Wuhan". It is composed of four vehicles and two tows. The train is approximately 140 meters long, 3.8 meters high and 3.0 wide. meters, with a maximum operating speed of 80 kilometers per hour. Each train has a capacity of approximately 1,896 passengers and an overcapacity capacity of approximately 2,640 passengers.

As the first fully automatic driverless subway vehicle made in Wuhan, its starting, driving, parking and detection are all completed automatically, representing the current high level of domestic advanced intelligent train industrialization, informatization and intelligence. , which is also a new leap forward for the rail industry "Made in Wuhan".

Site details