When will the house be handed over in Longdeng Hecheng, Suzhou?

The estimated delivery time of Longdeng Hecheng is: December 1, 2014.

Longdeng Hecheng Longdeng Hecheng project is located in the key planning and construction of the new urban area of ??Suzhou City. It is located in the southwest of Bianhe New District, Suzhou City, southwest of the scenic Delta Park, and one of the century-old famous schools in Suzhou City. The Sino-Singapore campus is directly to the west, west of Tongji 6th Road, east of West Outer Ring Road, south of Guangming Road, and north of Yinhe 2nd Road. The land is connected by Yinhe 3rd Road from north to south. The project is adjacent to Sucheng No. 1 Middle School, a century-old school in Suzhou, and is within easy reach of the Suzhou Municipal Party Committee, municipal office buildings and the newly built Delta Water Park. The Tuohe Green Corridor has convenient transportation, a profound cultural environment, and people-oriented planning and design, creating the commercial and residential community of "Longdeng Hecheng". The total land area of ??the project is about 379 acres, with a planned construction area of ??about 630,000_. The land is used for commercial and residential purposes. The project building complex consists of 6-story garden houses, 23- to 28-story high-rises, and independent commercial shops. It can be occupied by households. There are about 5,800 households, a residential population of about 20,000, 3,844 parking spaces for motor vehicles and 8,172 parking spaces for non-motor vehicles. The planned building area ratio is 2.5, the building density is 28%, and the greening rate is 33%. The supporting facilities include a farmer's supermarket with a construction area of ??1,000_; an economic rental house of 30,000_; a 12-class kindergarten of 3,300_; in addition, there are health service stations, cultural and sports activity stations, community neighborhood committees, cultural activities and property management offices, etc. The power plan of the Longdeng Hecheng project was approved by the relevant local power supply department. It was designed with energy conservation and emission reduction as the main purpose and was designed by the Municipal Electric Power Design Institute. The water supply was designed by the Municipal Water Company. Rainwater and sewage are diverted in the community, and rainwater and sewage are discharged into the municipal rainwater. sewage pipes, and central heating is used for heating. The Longdeng Hecheng project is surrounded by convenient transportation. To the west of the land is the 40-meter-wide Tongji 6th Road, to the south and north are the 24-meter-wide Yinhe 2nd Road and Guangming Road, and to the east is the 50-meter-wide West Outer Ring Road. Galaxy 3rd Road in the central part is 40 meters wide. The project has 64 buildings, including 35 high-rise buildings, 28 multi-story buildings, 1 6F office building, 1 3F kindergarten building, and 2F commercial buildings along the street. The first floor of the commercial building is 5.8 meters high, and the second floor is 2.9 meters high. Commercial signage, air-conditioning, and advertising spaces are designed in one go. The Longdeng Hecheng project takes the construction of a modern living space environment as the planning goal. On the premise of satisfying the economy, habitability, comfort, safety and durability of the residence, it creates a place with reasonable layout, complete functions, convenient transportation and beautiful environment. A modern community; the design embodies the ecological principles, cultural principles and efficiency principles, and strives to create a modern living space with an elegant environment, cultural connotation, economic benefits and distinctive personality, coordinate the surrounding related environment, respect the original urban texture, and reasonably determine the functions The layout displays and integrates the building groups into the urban environment, forms a new urban system with other surrounding buildings, and plays a positive role. The greening design of the community is based on "green". The design emphasizes the harmonious coexistence of man and nature, low density, and high greening rate. The plot has a large garden, each household has small group greening, and the bottom floor of the residential building is partially elevated. The height is not less than 3.9 meters, used as leisure greening. It allows residents to get as close to nature as possible and enjoy green space. This concept fully embodies the people-oriented design concept. The roads in the community adopt a design concept that completely separates people and vehicles, and ground parking is concentrated along the street on the north side and on the east side of the community. The system considers ground parking solutions for different types of vehicles without affecting the environment in the community. For parking of residences in the community, enter the community directly into the underground garage. The setting of these entrances and exits allows community vehicles to enter the underground garage within a short distance, minimizing the impact on the purely pedestrian environment inside the community. The fire lane system adopts the method of circulating through the entire community, combined with the high-quality concept of diversion of people and vehicles in the community, to Road landscaping. It is usually pedestrian-sized and meets the standards of emergency fire lanes, which not only ensures the smoothness of fire roads, reduces the interference of traffic noise to residents, but also improves the comfort of pedestrians. The total estimated cost of the Longdeng Hecheng project is 1.69 billion yuan, including 363.942 million yuan in land purchase costs, 38.6331 million yuan in upfront costs, 50.66 million yuan in infrastructure costs, 850.28 million yuan in construction and installation costs, and 188.5624 million yuan in public supporting facilities. , other project construction costs were 148.702 million yuan, and unforeseen costs were 49.2233 million yuan. The company plans to invest 350 million yuan in initial capital, and the rest of the funds will come from its own funds generated by the rolling development of the project. The whole process of the Longdeng Hecheng project is divided into the preliminary preparation stage, the design stage, the pre-construction preparation stage, the project implementation stage and the completion acceptance stage. The start time, end time and intermediate progress of each phase ABC of this project are as follows: Area A started in July 2011 and was completed in November 2013, Area B started in December 2012 and was completed in December 2014, Area C Construction of the area started in December 2011 and was completed in December 2013. The preliminary work stage was from May to July 2011.

Estimated implementation progress of the project: 1. Complete preliminary work such as project feasibility study and project approval from April to June 2011; 2. Complete project survey and design work from July to September 2011; 3. August to October 2011 Land acquisition and demolition work was completed in May; 4. Area A was completed from October 2011 to November 2013; 5. Area B was completed from December 2012 to December 2014; 6. Area C was completed from December 2011 to December 2013. .

Current price: 7,600 yuan/square meter.

It is located on the west side of the new campus of Sucheng No. 1 Middle School, Yinhe 2nd Road, Qiao District.

Property type: commercial-apartment, residential.

Decoration condition: rough.

Click to view: Longdeng Hecheng for more information.