Has the Binhai Port berm and wave blocking stone Zhendong Port Erjin Gate sea protection and management project been completed?

It’s finished.

According to relevant public information, the Binhai Port berm wave-blocking stone and Zhendong Port Erjin Gate sea protection and management project was officially completed on December 1, 2022.

The winning bidder for the Binhai Port Zhendong Gate and Erzeng Gate sea protection and management projects is Jiangsu Hehai Engineering Construction Supervision Co., Ltd. The main seawall beach protection project south of Zhendong Gate in Binhai County has a total length of 3.9 km, located between Zhendong Gate and Erfang Gate. This section of the sea wall is a level 2 embankment, and the Baotan dam engineering buildings are level 3. The main construction content of the project is to build a new riprap dam with a length of 3.562 kilometers, 3 riprap spur dams, 1 head dam, and repair water-damaged slope protection with a length of 200 meters.